Related Articles
Commission an RCP
Before you Begin Overview The SWN-RCP is a plug load control receptacle that can function as an occupancy-based load controller, when used in conjunction with SiteWorx Tune and Sense. The SWN-RCP is a Zigbee 3.0 device and requires installation and ...
Sensor Commissioning & Troubleshooting
Overview Since it's possible to connect multiple light fixtures to a single SCN or DLA sensor, Commissioner needs to understand what type of device(s) is (are) being controlled and metered. This step in commissioning is broadly referred to as DLA ...
Commission a TRH
Before a Temperature and Relative Humidity sensor (TRH) will work with SiteWorx, it must be added to a Mapfile and commissioned to a gateway. This process is completed by installers or a commissioning agent using the Commissioner software program in ...
Manual Fixture Control
Use this tool to help troubleshoot during initial commissioning. It's often used to confirm that dimming wiring is connected properly. Select a fixture on the map grid or in the fixtures tab Go to Edit > Advanced > Manual Fixture Control Move the ...
Commission a WIO
Before you Begin Necessary Items Commissioner 3.4.1 or newer Physical Setup Before commissioning a Wireless I/O Module (WIO), ensure that you have all associated materials related to the analog sensor that will interface with analog ports on the WIO. ...